basque digital innovation HUB logo
back to search

NAME

5 axis hybrid multiprocess center (machining + LMD): ZVH Add+Process

DESCRIPTION

High productivity 5 axis ZVH 45/1600 Add+Process Multiprocess machining center from Ibarmia manufacturer, with moving column and tilting head, for turning in horizontal (ø=750mm) and vertical (ø=1100mm) plates, machining in 5 axis with A+B and B+C and additive manufacturing by LMD-powder technolgy. The X/Y/Z and B axis courses are of 1600/800/900 and +105º (+45º with LMD head) respectively.
Toolpath programming and simulation in the commercial Powermill® CAM software. Measuring of manufactured part by structured light technology.

MOST OUTSTANDING EQUIPMENT AND COMPONENTS

4-stream YC52 LMD head from Precitec manufacturer +
Structured Light technology cameras for parts measurement +
Laser Source FL030 MM(FFC/FFS) 3kW fiber laser from Rofin manufacturer with a refrigeration system from Lotec manufacturer +
Thermographic camera OPTRIS (Temperature of 1000-2000ºC) +
Machining center ZVH Multiprocess 45/1600 Add+Process from Ibarmia manufacturer +

SERVICES OFFERED BY THE ASSET

services book icon
130

Recovery and repairing of high value-added parts

services book icon
142

Advice during development and validation of new products for additive manufacturing

services book icon
134

Feature addition or 3D part manufacturing by LMD and finishing

services book icon
132

Coating by LMD (laser Cladding)

services book icon
141

Development of databases and geometric models for LMD

services book icon
136

Testing and validation of new powder materials

services book icon
140

Feasibility analysis of manufacturing of parts by hybrid manufacturing (LMD+machining)

services book icon
139

Support in the design of parts

services book icon
138

Training

ENTITY MANAGING THE ASSET

FUNDACIÓN TECNALIA RESEARCH & INNOVATION

Paseo Mikeletegi, 7

20009 DONOSTIA-SAN SEBASTIÁN, GIPUZKOA

Contact person:

Alfredo Suarez

alfredo.suarez@tecnalia.com

imprimir

Ask for your proposal 4.0

Other related assets

Ask for your proposal

Let us get to know you better. Answer some questions and your 4.0
link will present you with the best proposal for incorporating 4.0 solutions

  • OrdenNecesidades 
    Order from 1 to 3, with 1 being your highest priority